North Cairo

Description

OneraSystems have finalized the supply and Installation of 160 KWp Solar PV Power Plants in 4 Sites connected to the National Grid for North Cairo Electrical Distribution Co., A Subsidiary of Egyptian Electricity Holding Co.

The installed Systems are generating approximately 280 MWH/Year, saving 158 Tons of CO2 yearly and 2.2 Million Cubic Feet of Natural Gas per Year.

Systems were installed within intiative of the Egyptian Government to install Solar PS Systems over 1,000 Govermental buidlings within 2 years.

Highlights

Modules Power

164 KWp

Grid Inverter Capacity

160 KW

Installation Period Per Site

15 Days