Description

Supply and Installation of 50 KWp Solar PV Power Plant over Low Voltage 380 VAC in Emirate Misr Gas Station, Cairo, Egypt

The system is installed on the Steel Rooftop of the factory.

The System will be saving 45 Tons of CO2 yearly and 600,000 Cubic Feet of Natural Gas per Year.

Highlights

Modules Power

AEG 330 KWp

Grid Inverter Capacity

SMA 50 KW

Yearly Production

80 MWH/Year