Description
OneraSystems have finalized the supply and Installation of 28 KWp Solar PV Power Plants in 2 Sites connected to the National Grid for Echem & Midtab Co., owned by Ministry of Petroleum.
The installed Systems are generating approximately 51 MWH/Year, saving 28 Tons of CO2 yearly and 390 Thousand Cubic Feet of Natural Gas per Year.
Systems were installed within intiative of the Egyptian Government to install Solar Power Systems over 1,000 Govermental buidlings within 2 years.