Description
Supply and Installation of 500 KWp Solar PV Power Plant over Low Voltage 380 VAC in Sadr EL-Hitan Water Desalination, North Sinai, Egypt
The system is Ground Installation
The System will be saving 450 Tons of CO2 yearly and 6.5 Million Cubic Feet of Natural Gas per Year.